PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Laying out block at the 2nd floor UCIA Facing North-East.jpg Erecting the stone panels at the South Elevation 1.jpg Erecting the stone panels at the South Elevation 2.jpg Erecting the stone panels at the South Elevation 3.jpg Installing pipe hangers at the 4th floor Facing North.jpg Parapet along the High Roof Facing East.jpg Parapet along the High Roof Facing West.jpg Storm piping at the High Roof Facing North.jpg storm piping at the low roof Facing North.jpg
Previous pageNext page Installing pipe hangers at the 4th floor Facing North
Installing pipe hangers at the 4th floor Facing North